E UROPEAN S YNCHROTRON R ADIATION

F ACILITY

INSTALLATION EUROPEENNE DE RAYONNEMENT SYNCHROTRON

EXPERIMENT RISK ANALYSIS

Experimental Number:Beamline:

Main Proposer:

Title of the Experiment:

1EXPERIMENT (only if changes since the proposal)

Classification of the sample:

Radioactive Contaminant Corrosive Oxidising

Explosive Biological

Other:

Sample Description:

Crystal Powder Polycrystalline Multilayer

Liquid Gas Nanoparticles

Other:

Container:

Capillaries Flat plate Pressure cell – Type:

Other:

ESRF equipment to be used:

Furnace Magnet Cryostat Cryogenic gas stream

Refrigerator Laser High pressure Fixed temperature

Other:

The Safety Group must immediately be informed of all modifications made and which differ from the original proposal and this at least two weeks before your arrival on site.

Your equipment has been tested by your home institute. No changes can be made before your arrival at the ESRF and until your experiment has started.

Page 1 / 12- Analyse des risques de l’expérience

2Risks associated with equipment to be used on site

Page 2 / 12- Experimental Risk Analysis

Page 3 / 12 – Experimental Risk Analysis

Page 4 / 12- Experimental Risk Analysis

Page 5 / 12 – Experimental Risk Analysis

Page 6 / 12- Experimental Risk Analysis

Page 7 / 12 – Experimental Risk Analysis

3Risks associated with the use of chemicals and gases

3.1Chemicals and gases to be used:

Extra rows needed? Just type Yes in the box which will appear when you have completed the final cell in the above table

Page 8 / 12- Experimental Risk Analysis

3.2Risks and associated preventive measures

Classification of the

chemical / gas

Name(s) Risks Preventive measures

Explosive (unstable) Yes No Explosion (dispersion in the air, incompatibilities, presence of static electricity, impacts, possible friction…)

Flammable Yes No Projection Fire Explosion

Oxidising Yes No Fire Explosion

Corrosive Yes No Skin and eye burns Attack of materials

Toxic

Yes No Chronic or acute intoxication

Page 9 / 12 – Experimental Risk Analysis

Classification of the

chemical / gas

Name(s) Risks Preventive measures

CMR (Carcinogenic, Mutagenic or toxic to Reproduction)

Yes No Serious effects on human health (cause cancer, modifies DNA, harms fertility)

Harmful, Irritating

Yes No

Skin and eye irritations

Nanoparticles Yes No Toxic effect on human health

Explosion Dispersion

Biological samples

Yes No Allergenic Secondary infection Oncogenic

Toxic

Page 10 / 12- Experimental Risk Analysis

Classification of the

chemical / gas

Name(s) Risks Preventive measures

Biological samples Pin prick Cut Other

Radioactive samples

Yes No Contamination Irradiation Pyrophoric Other

Use of gas cylinders

Gas under pressure

Yes No Explosion (due to heat or following a fall) Asphyxiation

Page 11 / 12 – Experimental Risk Analysis

4Stage by stage description of the experiment

In this description you must indicate, stage by stage, all the preparation, set-up and testing phases of your experiment which you will carry out on site.

For each phase you must specify:

-which of the above-mentioned equipment will be used,

-the conditions in which the equipment, products will be used,

-the particular risks of the stage,

-feedback on previous use (incidents which already occurred involving this type of equipment or installation),

5In the event of an emergency

Should a problem occur with your samples, equipment, chemicals, processes... during the preparation of your experiment or while it is taking place, indicate what interventions you propose:

6Documents which must accompany the dossier

-Photo (jpg) of the installations and equipment which belong to you

-Compliance certificates for the equipment or documents which prove compliance (lasers, furnace …)

-Documents proving the tests which were carried out (high pressure cells (except Paris-Edinburg and diamant), home-made equipment)

Documents and images may be inserted here (insert - object – browse to file – select display as an icon):

Page 12 / 12- Experimental Risk Analysis

施工安全风险评估报告

第一章概述 一、施工安全风险评估简介 (一)、评估目的市政桥梁工程施工环境条件复杂,施工组织实施困难,作业安全风险高居不下,一直以来是行业安全监管的重点环节。在施工阶段建立安全风险评估制度,通过定性或定量的施工安全风险估测,能够增强安全风险意识,改进施工措施,规范预案预警预控管理,有效降低施工风险,严防重特大事故发生。 施工安全风险评估是市政桥梁工程设计风险评估在实施阶段的深化和落实,根据项目施工组织设计内容,辨识和评价本工程施工过程中可能存在的风险源的种类和程度,提出合理可行的安全对策措施及建议。贯彻“安全第一、预防为主、综合治理”的方针,为本工程施工阶段的安全管理提供科学依据,确保建设项目施工期间实现安全生产,使事故和危害引起的损失最少。 本次评估的目的是在对施工图设计、第五标段项目施工组织设计等项目建设资料进行研究的基础上,根据同类工程建设过程中发生的相关安全事故特点,辨识本项目施工过程中各项作业活动、作业环境、施工设备、危险物品等所潜在的风险,并对其进行定性、定量分析,以求明确各类危险源的种类及危害程度,进而从安全技术和组织管理等方面提出可行的安全措施,提高本工程施工期间的安全度,实现安全生产。 (二)、评估原则本次评估以国家现行的有关安全生产的法律、法规及技术标准为依据,以《晋中市城区东、南外环道路快速化改造项目第五合同段施工图设计》、《晋中市城区东、南外环道路快速化改造项目第五合同段施工组织设计》为基础,用科学的评估方法和规范的评估程序,坚持科学性、公正性、针对性等原则,以严肃的科学态度开展本工程的施工安全风险评估工作。 (三)、评估内容市政工程施工安全风险评估包括总体风险评估和专项风险评估两项内容。 1、总体风险评估桥梁工程开工前,根据桥梁工程的地质环境条件、建设规模、结构特点等孕险环境与致险因子,估测桥梁工程施工期间的整体安全风险大小,确定静态条件下的安全风险等级。 2、专项风险评估 当桥梁工程总体风险评估等级达到川级(高度风险)及以上时,将其中高风险的施工作业活动(或施工区段)作为评估对象,按照施工组织设计所确定的施工工法,分解施工作业程序,结合工序(单位)作业特点、环境条件、施工组织等致险因子及类似工程事故情况,进行风险源普查,并针对其中重大风险源进行量化评估,提出相应的风险控制措施。 本次评价的重点是晋中市城区东、南外环道路快速化改造工程第五合同段项目建设 中的桥梁工程,通过逐一总体评估确定风险等级后,对其中桥梁工程进行专项评估,建立风险源普查清单,并通过风险分析和估测,确定重大风险源及其风险等级,继而提出科学合理的对策措施及建议,得出评估结论。 第二章工程概况

建设工程合同风险

建设工程合同风险 篇一:建设工程合同风险控制 建设工程合同风险分析及对策 摘要:合同管理是建设工程管理的重要内容之一,本文对建设工程合同中存在的风险进行了分析,并提出了减少或避免合同风险的对策建议。 随着科技创新的迅速发展,新材料、新工艺、新技术不断地被应用到建筑领域,使得现代工程的规模越来越大,使用功能高且多样化。参加建设的单位及专业也越来越多,而且工期要求越来越短。还有不可摆脱的自然环境,现场条件及社会因素的影响。因此几乎没有不存在风险因素的工程。承包工程是一项具有风险性的行业。由于工程项目建设关系的多元性、复杂性、多变性、履约周期长等特征及金额大,市场竞争激烈等构成了项目承包合同的风险性。因此,慎重分析研究各种风险因素,在签定合同中尽量避免承担风险的条款,在履行合同中采取有效措施,防范风险发生是十分重要的。 1、建设工程合同风险 在实际建设工程中,由于合同人员素质不高或由于市场竞争激烈,承包商急于拿下此工程而做出一些不适当的让步等原因,导致签定的合同存在风险,主要表现在以下几个方面:

合同中已明确规定乙方承担的风险 大量的承包工程合同中都有对乙方承担风险的条款规定。例如,某工程合同协议条款中,规定该工程变更的费用总额当超过合同总价15%以上时,甲方对超过的部分应给予补偿。显然,乙方若遇到变更较多的工程,至少要先损失合同总价的15%.反之,当该工程变更较少时,乙方将会有较高的盈利。又如,某合同中规定,乙方采购运进场地的工程材料,必须经甲方工地代表认可后方能用于工程。在这里“认可”没有明确的标准,甲方代表可能会以此条款要求提高材料的档次,使乙方支付较高的材料费。 合同条文不完整,隐含潜在的风险某合同中规定每月20日支付上个月的工程进度款,但因甲方资金筹措受阻,连续三个月拖欠工程款。乙方为了工程的进度不受影响,垫入了大笔资金。但由于合同中没有具体写入拖欠工程进度款的处罚规定,导致乙方向甲方对垫支资金利息的索赔失败,蒙受了较大的经济损失。类似情况在当前合同中并不少见,有的合同中只规定了甲方提供施工场地的时间,但没有规定出具体范围和违约(没有按时提供)的处罚条款。 合同中仅对一方规定了约束性条款的不利合同风险 某工程合同中规定,从甲方全部提供施工场地之日起15日开工,并按实际开工日计算工期,而后乙方应负延期一切责任。该工程合同开工日为1997年4月25日,由于场地搬

建筑工程承包合同风险的防范措施(word版)

建筑工程承包合同风险的防范 措施 Through the process agreement to achieve a unified action policy for different people, so as to coordinate action, reduce blindness, and make the work orderly. 编制:___________________ 日期:___________________

建筑工程承包合同风险的防范措施 温馨提示:该文件为本公司员工进行生产和各项管理工作共同的技术依据,通过对具体的工作环节进行规范、约束,以确保生产、管理活动的正常、有序、优质进行。 本文档可根据实际情况进行修改和使用。 建筑工程合同风险较大, 化解风险是建筑企业非常关注的问题。建筑企业要正确评价风险, 采取适当的防范措施。 风险的来源 建筑工程合同风险属于建筑工程风险, 建筑工程周期较长, 所涉及的风险因素多, 风险较大。虽然参与工程的各方均有风险, 但承担风险的大小却有所不同。具体来讲, 在一个工程中, 在建设工程决策阶段, 业主承担主要风险, 投资决策失误意味着整个项目的失败。在工程建造过程中, 建筑企业承担的风险远大于业主。正是这个原因, 建筑行业中增大了建筑企业的索赔权限。建筑工程合同的风险主要有以下几点:一是投资风险;二是非建筑企业原因造成的社会风险和客观风险, 如地震等自然灾害, 这种风险一般难于预料和防范;三是主观类风险, 这里特指不讲诚信的欺诈类风险。 风险的识别 应该看到, 任何建筑企业在承揽工程时不可能不承担风险, 但如何承担风险, 承担多大风险, 以及如何化解风险是一个建筑企业不得不关注的问题。化解风险之前必须对其进行识别, 风险管理实际上就是一个识别、确定风险和化

安全生产分析研判报告

华彬煤业股份家河煤矿 〈〈安全生产风险分析研判报告》编制人: 总工程师: 矿长: 煤矿(公章) 2018年8月2日 目录: 华彬煤业股份家河煤矿 〈〈安全生产风险分析研判报告》 一、基本情况 (一)矿井情况: 本企业性质、矿井规模、通风、运输等生产系统、生产建设现状、煤矿安全生产标准化达标、矿井主要灾害分类分级、6大系统建设等情况。 (二)组织开展安全风险研判分析情况: 下发文件、方案制定、工作布置、召开专题会议和宣贯等情况,煤矿主要负责人及管理人员组织开展安全风险研判等情况。 二、主要安全风险分析 (一)矿井灾害安全风险分析: 按照灾害类型(瓦斯、水、火、煤尘、顶板、冲击地压、煤与瓦斯突出、机电、运输、其他),对各生产安全系统、各水平、各采区、各工作面重大灾害情况进行全面分析。 1. 瓦斯风险分析

例如: (1) 人员配备,机构设置风险分析。 (2) 瓦斯防治法律法规、设计方案、措施制度等方面的风险分析。 (3) 瓦斯防治的法律法规、设计方案、措施制度等执行情况风险分析。瓦斯抽放的现状分析。 (4) 瓦斯防治装备和安全投入情况分析。 (5) 存在风险点和薄弱点是什么。主要包括:生产系统、矿井水平、采 区、工作面、装备、单位、岗位、管理环节等入、机、环、管、法”方面的风 险点和薄弱点。 (6) 瓦斯风险的对策和措施 2. 水害风险分析 3. 防灭火风险分析 水、火、煤尘、顶板、冲击地压、煤与瓦斯突出、机电、运输等重大灾害的风险分析参照瓦斯风险分析模板示例。 各矿井根据白身的主要灾害进行风险研判分析。 (二)8个方面突出问题分析(在统计基础上分析):按照〈〈国家煤矿安全监察局关于进一步深化依法打击和重点整治煤矿安全生产违规行为专项行动的通知》(煤安监监察〔2018〕16号)要求,结合2017年安全体检”和今年煤矿安全攻坚行动专家排查问题和两次督查情况,逐条逐项对照通知中8个方面问题,从生产系统、矿井采区、工作面、装备、单位、岗位、管理环节等入、机、环、管、法”方面进行研判分析,不能漏项。 通过认真分析研判,找准8个方面问题的风险点和薄弱点,并列出清单。

建筑工程施工安全风险分析与控制

建筑工程施工安全风险分析与控制 1 建筑施工中安全风险得常见类型 一般来讲安全风险是指在整个建筑工程施工过程中,发生危险、发生事故,从而造成人员伤亡、财产损失的可能性或概率。据建设部全国建筑施工安全生产形势分析报告,从2008年以来,我国建筑施工中常见的安全风险起所占比例主要是高处坠落、施工坍塌、物体打击、起重伤害、机具伤害“五大伤害”类型、另外触电、火灾等安全事故也时有发生。全国重大事故死亡人数略有抬头趋势,造成的直接和间接经济损失巨大。 2 建筑施工安全风险发生的主要原因 建筑施工是由人员、设备、环境和管理四方面组成的系统,特点是工序多、作业过程复杂、生产过程始终处于动态变化中,且目前建筑市场存在业务层层分包、主体对安全缺乏重视等不良现象。种种分析表明事故的原因主要归咎于人、物、环境三者的相互关系,并受管理的制约。 (1)人的原因 这里的人是指操作工人、管理人员和其他现场人员等。人的不安全行为大多是因为对安全不重视、态度不正确、技能或知识不足、健康或生理状态不佳和劳动条件不良等因素造成的,是事故的重要致因。包括违章指挥、违章作业、违反劳动纪律的“三违”现象。 (2)物的原因 物的不安全状态是生产中的危险源、是构成事故的物质基础。如材料

倾诉不够,防护用品缺乏或由缺陷,存在危险物和有害物等;另外,有些施工机械设备和装置结构不良、年久失修、零部件过度磨损或带“病”作业,加之施工中超负荷运转,加重了设备的老化程度或导致安全防护装置失灵等。 (3)环境的原因 不安全的环境是引发安全事故的直接原因。不安全的工作环境因素主要有通风不良、噪音过大、物料储放不当等几方面。在外界环境作用下,工人在操作时很难做到思想高度集中,容易造成分心、紧张、烦躁、反应力差等。 (4)管理的原因 管理缺陷会引起设备故障或人员失误,许多事故的发生是由于管理不到位而造成的。管理的原因是事故直接原因得以存在的前提条件,包括技术指导上的缺陷;劳动组织不合理; 建筑工程申请认证!财富值双倍检索优先专属展现同行交流 没有安全操作规程或操作规程不健全;对安全工作检查指导不足或有误;教育培训力度不够;事故防范措施不认真落实;安全隐患整改不到位等。 3 建筑工程施工项目安全风险识别 建筑工程施工安全风险识别是要确定在建筑施工中存在哪些安全风险,这些安全风险可能会对工程产生什么影响,并将这些风险及其特

露天煤矿矿井安全生产风险分析研判报告

一、基本情况 (一)榆林市榆阳区方家畔煤业有限责任公司位于陕北榆神矿区中部,榆林市榆阳区与神木县交界处,隶属于榆阳区大河塔乡管辖,矿田面积为32.6987km2,矿井规模为1.20Mt/a;2#煤层为露天开采,3#煤层为井工开采。于2017年根据(陕煤局复[2017]62号)《陕西省煤炭生产安全监督管理局关于榆林市榆阳区方家畔煤矿资源整合项目开采顺序调整的批复》文件内容,将开采顺序调整为先露天后井工,露天开采共划分两个采区,工业储量2460Mt,可采储量1925Mt,面积2.4km2,规模120Mt/a,开采工艺为单斗液压铲—卡车开采工艺,采高10.19m,覆盖层深度为20~110m。服务年限15年,于2018年5月25日经(榆区煤函[2018]68号)《榆阳区煤炭局关于榆林市榆阳区方家畔煤业有限责任公司方家畔煤矿露天开采项目开工备案的函》文件批复开工建设。 设备型号 生产设备选型剥离采用斗容3.0m3液压铲采装,与其匹配的自卸卡车为35t车型,排土设备选用320HP履带推土机。采煤采用斗容3.0m3液压铲采装,与其匹配的自卸卡车为35t 车型。 开拓运输系统 原煤经过工作面的移动坑线,直接运至地表,经地表联络道路运至储煤场。 剥离系统的物流流向为:工作面液压铲→自卸卡车→前期外排、后期内排。 疏干防排水工程 本矿不设独立的地下水疏干工程,采掘场平盘设平盘排水沟、集水坑,通过排砂潜水电泵将进入采掘场内的含水层

残余水与地表降雨径流量一起,经明设的快速接头钢管就近排至采掘场排水泵站。排水管路最终引至矿坑水处理站,处理后进入矿区复用水利用系统充分利用。 电源及供电方案 本设计在工业场地内新建一座10kV变电所,其两回10kV 电源分别引自大保当110/35/10kV变电站10kV不同母线段,输电线路距离为9.2km。工业场地10kV变电所以10kV电压供筛分车间、露天采区采掘系统、工业场地10/0.4kV箱式变电站、等所有10kV及0.4kV负荷用电。在露天矿采掘场设10kV环网架空线路,导线选用LGJ-95,两回电源分别以10kV架空线路引自工业场地10kV变电所10kV不同母线段。 安全避险系统 本矿由于属露天开采,现场不宜设置避难场所。根据现场实际我矿购置了现场应急电缆900米、潜水泵(2寸污水泵)3台、潜水泵(22千瓦4寸污水泵)3台、应急皮卡车4辆、规划了现场撤人路线和设立撤离路线,按要求赋予现场管理人员和现场巡查人员在遇险时的直接指挥和决策权。确保矿井出现灾变时,现场所有作业地点人员能在第一时间安全撤离。 (二)为认真贯彻落实省煤炭生产安全监督管理局关于安全生产的重要指示精神,按照《榆林市煤矿安全攻坚行动领导小组办公室转发关于进一步深化依法打击和重点整治煤矿安全生产违法违规行为专项行动的通知》和《榆阳区煤炭局转发榆林市煤矿安全攻坚行动领导小组办公室转发关于进一步深化依法打击和重点整治煤矿安全生产违法违规行为专项行动的通知的通知》文件精神,进一步落实安全生产主体责任,

安全生产风险分析报告

XX股份有限公司 安全生产风险分析报告 20XX年XX月

目录 第一章总则 (1) 1.1 编制目的 (1) 1.2 编制原则 (1) 1.2 编制依据 (1) 1.2.1法律、法规 (1) 1.2.2部门规章、地方法规 (1) 1.2.3规范、标准 (2) 1.3 适用范围 (3) 1.4 评估程序 (3) 1.5 风险评估报告的修订 (3) 第二章企业信息和事故风险分析 (4) 2.1 基本信息 (4) 2.1.1地理位置 (4) 2.2 生产工艺 (4) 2.3主要设备设施及未使用危化品情况说明 (8) 2.3.1主要生产设备设施 (8) 2.3.2使用危化品情况说明 (9) 2.4总平面布置及主要建、构物情况 (11) 2.4.1总平面布置 (11) 2.4.2主要建、构物情况 (12) 2.5风险分析 (12) 2.5.1主要风险分析 (12) 2.5.2重大危险源辨识情况 (10) 2.6风险及应急处置措施 (14) 附XX股份有限公司安全风险分级管控表 (15)

第一章总则 1.1 编制目的 通过系统性的分析和评估,识别场区安全生产事故风险物质,事故风险装置,确定场区事故风险源,评估其可能导致的事故及影响后果,评估场区现有防控能力和水平,并提出切实可行的降低事故风险的措施和工作思路。 1.2 编制原则 (1)事故风险评估编制应体现科学性、规范性、客观性和真实性的原则。(2)事故风险评估过程中应贯彻执行我国安全生产相关的法律法规、标准、政策,分析场区自身事故风险状况,明确事故风险防控措施。 (3)认真排查场区的事故风险,确保全面辨识,科学分析,查找重点风险; (4)事故风险评估报告是应急预案编制重要部分。 1.2 编制依据 1.2.1法律、法规 《中华人民共和国安全生产法》国家主席令笫13号 《中华人民共和国突发事件应对法》国家主席令第69号 《中华人民共和国职业病防治法》国家主席令第52号(2017年第三次修正) 《中华人民共和国环境保护法》国家主席令第22号(2014年修订)《中华人民共和国消防法》国家主席令第6号 《中华人民共和国特种设备安全法》国家主席令第4号 《生产安全事故报告和调查处理条例》国务院令第493号 1.2.2部门规章、地方法规 《突发事件应急预案管理办法》国办发〔2013〕101号

项目施工安全风险评估报告

余杭区鸬鸟镇2018 年“四好农村路”提升改造工程 施 工 安 全 风 险 评 估 报 告 编制人: 技术负责人: 项目经理: 浙江沪杭甬养护工程有限公司 余杭区鸬鸟镇 2018 年“四好农村路”提升改造工程项目经理部 二 0 一八年九月

目录 一、编制依据 . ...........................................................- 2 - 二、风险评估 . ...........................................................- 2 - 1、评估对象目标及范围 (2) 1.1 评估对象 ........................................................- 2 - 2、评估目的 (2) 二、工程概况及主要工程数量 . .............................................- 2 - 2.1工程概况 (2) 2.2主要工程数量 (2) 三、评估过程和评估办法 . .................................................- 2 - 3.1成立风险评估小组 (2) 3.2评估办法 (2) 四、公路工程风险评估 . ...................................................- 3 - 4.1总体风险评估 (3) 4.2专项风险评估 (3) 4.3风险分析 (5) 4.4安健环危害因素分析 (6) 五、活动风险源辨识 . .....................................................- 9 - 5.1活动风险等级划分 (9) 5.2风险等级判断 ......................................................- 11- 七、风险控制 . (11) 八、评估结论 . (12)

合同模板风险分析论文

合同风险分析 1 投标函附录的风险分析 1.1 Employer’s name and address,Contractor’s name and address,Engineer's name and address. 附录内容:Employer’s name and address:Guocoland Binh Duong Property Co.,Ltd Suite 1203 , Saigon Trade Center 37 Ton Duc Thang street Ho Chi Minh city, Vietnam Tel : 84-8-8233 338 Fax: 84-8-8233 339; Contractor’s name and address:China State Construction Engrg Corp ( CSCEC) 6th Floor, Lawrence S.Ting Building , 801,Nguyen Van Linh Road, Tan Phu Ward, District 7, Ho Chi Minh city, Vietnam; Engineer 's name and address:RSP Architects Planners & Engineers ( Vietnam) Co., Ltd 151-151 Bis, Vo Thi Sau Ward 6, District 3 Ho Chi Minh city, Viet Nam. 风险分析:本工程的承包商是中国的公司,业主和工程师差不多上越南本地的公司,这就给承包商增加了风险,在某些情况上,业主和工程师可能会串通一气,给承包商到来损失,一般国际的承包工

施工安全风险评估管理办法

中铁大桥局股份有限公司福平铁路FPZQ-3标项目经理部一分部 施工安全风险评估管理办法 第一章总则 第一条为规范福平铁路FPZQ-3标一分部风险评估与管理工作,建立和完善项目风险评估与管理体系,充分辨识出项目的潜在危险,完善风险控制措施,使风险评估更具实际指导意义。依据《铁路建设工程安全风险管理暂行办法》(铁建设【2010】162号)文件规定,结合实际,特制定本办法。 第二条福平铁路FPZQ-3标一分部风险评估与管理工作,贯穿施工全过程,项目风险评估与管理,各相关单位应主动、及时、动态地进行,以保证风险评估全面、可靠,风险处理合理、有效,风险监测准确,反馈及时。 第三条各阶段风险评估与管理,应根据施工技术特点,针对安全、环境、质量、投资、工期及第三方等风险,以安全风险为风险评估与管理重点,高度重视具有突发性和灾难性的风险。对安全风险等级评定为极高的,应予以规避。 第四条福平铁路FPZQ-3标一分部工程风险评估与管理将根据不同建设阶段的任务、目的和要求,针对施工技术特点,确定评估与管理对象、目标和方法。 第二章风险评估管理目标 第五条风险评估管理目标:根据风险评估结果,提出相应的施工措施,注重施工管理、措施评价和落实,保证施工安全和减少损失。 安全目标:杜绝较大及以上安全事故 环境目标:满足环境保护、水土保持总体目标,专项验收一次通过

工期目标:满足施工合同工期要求 投资目标:控制在铁路总公司批复的初步设计概算以内 第三章风险评估管理机构 第六条为推进福平铁路FPZQ-3标一分部风险评估与管理工作,成立风险评估与管理组织领导小组。 组长:常务副经理 副组长:总工程师、常务副总工、各工区经理 组员:副书记、副总工、各部门负责人 项目风险评估工作主要由由安质环保部负责。 第四章管理职责 第七条各工区应分别建立风险评估与管理领导小组。 第八条各相关单位应积极参与风险评估与管理,通过风险计划、风险识别、风险评价、风险处理和风险监测,优化组合各种风险管理技术,对工程实施动态、有效的风险控制和跟踪处理。 第九条一分部评估小组主要职责: 1、积极参与项目的风险评估工作。 2、严格按照风险评估管理工作实施。 3、对参与风险管理的作业人员上岗前进行培训。 第五章风险评估 第十条风险评估组织工作的基本规定 1、风险评估工作,应结合各施工阶段工作特点和内容,确定风险评估对象和目标,进行评估工作,提出相应的风险处理措施。当风

建设工程合同风险分析及对策

建设工程合同风险分析及对策 随着科技创新的迅速发展,新材料、新工艺、新技术不断地被应用到建筑领域,使得现代工程的规模越来越大,使用功能高且多样化。参加建设的单位及专业也越来越多,而且工期要求越来越短。还有不可摆脱的自然环境,现场条件及社会因素的影响。因此几乎没有不存在风险因素的工程。承包工程是一项具有风险性的行业。由于工程项目建设关系的多元性、复杂性、多变性、履约周期长等特征及金额大,市场竞争激烈等构成了项目承包合同的风险性。因此,慎重分析研究各种风险因素,在签定合同中尽量避免承担风险的条款,在履行合同中采取有效措施,防范风险发生是十分重要的。 1、建设工程合同风险 在实际建设工程中,由于合同人员素质不高或由于市场竞争激烈承包商急于拿下此工程而做出一些不适当的让步等原因,导致签定的合同存在风险,主要表现在以下几个方面: 1.1合同中已明确规定乙方承担的风险 大量的承包工程合同中都有对乙方承担风险的条款规定。例如, 某工程合同协议条款中,规定该工程变更的费用总额当超过合同总价15%以上时,甲方对超过的部分应给予补偿。显然,乙方若遇到变更较多的工程,至少要先损失合同总价的15%反之,当该工程变更较少时,乙方将会有较高的盈利。又如,某合同中规定,乙方采购运进场地的工程材料,必须经甲方工地代表认可后方能用于工程。在这里“认可” 没有明确的标准,甲方代表可能会以此条款要求提高材料的档次,使乙方支付较高的材料费。 1.2合同条文不完整,隐含潜在的风险 某合同中规定每月20日支付上个月的工程进度款,但因甲方资金筹

措受阻,连续三个月拖欠工程款。乙方为了工程的进度不受影响,垫入了大笔资金。但由于合同中没有具体写入拖欠工程进度款的处罚规定,导致乙方向甲方对垫支资金利息的索赔失败,蒙受了较大的经济损失。类似情况在当前合同中并不少见,有的合同中只规定了甲方提供施工场地的时间,但没有规定出具体范围和违约(没有按时提供)的处罚条款。 1.3合同中仅对一方规定了约束性条款的不利合同风险 某工程合同中规定,从甲方全部提供施工场地之日起15日开工, 并按实际开工日计算工期,而后乙方应负延期一切责任。该工程合同开工日为1997年4月25日,由于场地搬迁碰到难题,到1997年6月30日才具备开工条件。基础工程因地下室面积大,正赶上雨季施工,投入了大量人力、物力,进度缓慢。当乙方想起应提出索赔延期时,因合同签定的条款对乙方十分不利而致使索赔无力,乙方只好自费赶工,避免拖期受罚。 2、签定有利的工程合同 合同风险是属于不确定事件,可能发生,也可能不发生。但任何承包工程的乙方都愿意签定一个对自己有利的合同,减少工程施工中的风险损失,获得更多的利润。对于承包工程的乙方来说,对自己有利的合同,可以从以下几个方面进行定性的评价: 2.1合同的条款、内容要完整、全面。对自己比较有利或比较优惠的条款都已明确表达,不会使对方发生误解。 2.2合同价格较高,如在正常管理状态下,施工应有较好的盈利。 2.3合同双方责权利关系比较平衡,没有苛刻一方的单方面约束条款 2.4合同内容条理清楚,责权分明,前后一致,概念准确,执行中不易产生争执。

建设工程施工合同的风险

建设工程施工合同中隐藏的七大风险和化解妙招 2017-08-02 建设工程施工合同是建设工程合同的主要形式,其订立阶段的主要任务,是当事人双方就建设工程施工合同的主要条款达成意思表示一致,因此,管理建设工程施工合同的风险,应当首先从合同签订过程入手,对建设工程施工合同订立阶段的风险进行识别,也是进行合同后期风险处理的基础。 一、未依法进行招标投标或中标无效的风险 我国建设工程施工合同的法定前置程序:经招投标过程且有效中标。未依法进行招标投标或中标无效的情形,主要体现在《招标投标法》的规定,《施工合同司法解释》第一条规定:“建设工程必须进行招标而未招标或中标无效的,认定合同无效。”《招标投标法》及国家发改委《工程建设项目招标范围和规模标准规定》规定商品住宅,包括经济适用住房均在必须招标的范围内。 《招标投标法》规定的中标无效的情形有:(1)招标代理机构泄密或恶意串通;(2)招标人泄露招标情况或标底;(3)投标人串标或行贿;(4)投标人弄虚作假骗取中标

;(5)招标人在确定中标前与投标人进行实质性谈判;(6)招标人违法确定中标人。 律师策略:发包人在签订合同之前,应严格按照国家规定以招标投标的形式确定合适的承包人。选择招标方式上可根据实际情况采用公开招标或邀请招标的方式进行。承包人一定要做投标法律手续,否则,工程施工到中途会有很多不确定风险。 二、中标通知书发出后承包方拒绝签订合同的风险 我国《招标投标法》第45条规定:“中标通知书对招标人和中标人具有法律效力。中标通知书发出后,招标人改变中标结果的,或者中标人放弃中标项目的,应当依法承担法律责任。”第46条又规定:“招标人和中标人应当自中标通知书发出之日起30日内,按照招标文件和中标人的投标文件订立书面合同。招标人和中标人不得再行订立背离合同实质性内容的其他协议。” 律师策略:根据我国法律规定,中标通知书发出后,招标方与投标方就具备了合同关系,《建设工程施工合同》是对招投标文件中未明确事项的进一步明确,因此,对于发包人而言,要在中标通知书发出后30日内,按照招标文件和中标人的投标文件订立书面合同。

安全生产分析研判报告

陕西华彬煤业股份有限公司蒋家河煤矿《安全生产风险分析研判报告》 编制人: 总工程师: 矿长: 煤矿(公章) 2018 年8 月 2 日

目录:

陕西华彬煤业股份有限公司蒋家河煤矿《安全生产风险分析研判报告》 一、基本情况 (一)矿井情况: 本企业性质、矿井规模、通风、运输等生产系统、生产建设现状、煤矿安全生产标准化达标、矿井主要灾害分类分级、6大系统建设等情况。 (二)组织开展安全风险研判分析情况: 下发文件、方案制定、工作布置、召开专题会议和宣贯等情况,煤矿主要负责人及管理人员组织开展安全风险研判等情况。 二、主要安全风险分析 (一)矿井灾害安全风险分析: 按照灾害类型(瓦斯、水、火、煤尘、顶板、冲击地压、煤与瓦斯突出、机电、运输、其他),对各生产安全系统、各水平、各采区、各工作面重大灾害情况进行全面分析。 1.瓦斯风险分析 例如: (1)人员配备,机构设置风险分析。 (2)瓦斯防治法律法规、设计方案、措施制度等方面的风

险分析。 (3)瓦斯防治的法律法规、设计方案、措施制度等执行情况风险分析。瓦斯抽放的现状分析。 (4)瓦斯防治装备和安全投入情况分析。 (5)存在风险点和薄弱点是什么。主要包括:生产系统、矿井水平、采区、工作面、装备、单位、岗位、管理环节等“人、机、环、管、法”方面的风险点和薄弱点。 (6)瓦斯风险的对策和措施 2.水害风险分析 …… 3.防灭火风险分析 …… 水、火、煤尘、顶板、冲击地压、煤与瓦斯突出、机电、运输等重大灾害的风险分析参照瓦斯风险分析模板示例。 各矿井根据自身的主要灾害进行风险研判分析。 (二)8个方面突出问题分析(在统计基础上分析):按照《国家煤矿安全监察局关于进一步深化依法打击和重点整治煤矿安全生产违法违规行为专项行动的通知》(煤安监监察〔2018〕16号)要求,结合2017年“安全体检”和今年煤矿安全攻坚行动专家排查问题和两次督查情况,逐条逐项对照通

安全风险研判报告

仁怀市五马镇富康煤矿重大安全风险分析研判报告 二0一八年八月

目录 第一章矿井概况 第二章研判依据、目地及主要危险因素的识别分析第三章安全风险研判范围 第四章安全风险辩识研判 第五章安全风险管控措施 (一)瓦斯事故风险管控措施 (二)煤尘危害风险管控措施 (三)火灾事故风险管控措施 (四)水害事故风险管控措施 (五)电气设备事故风险管控措施 (六)机械事故风险管控措施 (七)提升事故风险管控措施 (八)运输事故风险管控措施 (九)冒顶事故风险管控措施 (十)易燃易爆事故风险管控措施 (十一)爆炸物品事故风险管控措施

仁怀市五马镇富康煤矿安全风险分析研判报告 第一章矿井概况 一、煤矿企业基本情况 一、矿井基本情况 富康煤矿位于贵州省仁怀市五马镇境内,隶属于五马镇管辖。矿区范围由4个拐点圈定。井田走向长度约1.5km,宽约0.5km,井田面积为:0.714K m2,开采标高+1025~+330米。矿井设计生产能力为15万t/a,服务年限为13.91a。矿区煤系地层为二叠系龙潭组,区内主要可采煤层共3层,编号分别是为 C5、C7、C12煤层,保有资源储量为672万吨,设计可采储量292.095万吨。矿井采用斜井开拓,设有三条井筒,分别是主、副井及专用回风井。矿井划分为一个水平二个采区,水平标高+480m,设计以一个采区一个炮采工作面和二个掘进工作面达到设计能力。 目前开采煤层C5, 自燃倾向性均为Ⅲ类(不易自燃),煤尘无爆炸危险性。矿井瓦斯等级:高瓦斯矿井 目前矿井各系统情况: 通风系统 矿井通风方式为中央并列式,通风方法采用机械抽出式。风井井口安装FBCDZ №16—2×75KW通风机两台,一台工作、一台备用。主扇风量为1740—4080m3/min,风压为746—2720Pa,各采掘工作面风量分配合理,矿井备用风量充足。局部通风已实现双风机、双电源自动切换控制。矿井通风系统整体符合设计要求。 (三)运输系统 ⒈运煤系统 主井安装DTL80/20/132S型固定架皮带一台,担负全矿井煤炭运

建筑工程施工安全风险评价研究分析

摘要 安全关系着个人、家庭乃至社会的命脉,是经济发展和社会稳定的基本条件,同时也是发展国民生产力、促进社会经济可持续健康发展的基本保证。上海的“11.15”事件再次给人们敲响了警钟,安全事故造成的危害和影响倍受各界的关注。尽管我国对建筑施工安全生产非常重视,各个施工企业也做了大量的安全工作,但由于施工项目的多样性、施工环境的复杂性、安全技术及安全管理在现阶段还存在很多不足之处。所以如何保障和提高建筑施工现场的安全性就成为建筑工程施工中重要的研究课题。 本文以风险管理和安全管理等理论为基础,在深入调查国内外建筑安全管理现状的基础上,从建筑工程施工阶段的危险源识别和分析工作开始,结合人的原因、物(即机械、材料等)的原因、环境的原因和管理的原因四个方面,对施工现场四口五临边、脚手架、机械设备、施工坍塌和线路触电五大风险因素进行了合理的分析和评价。结合建筑工程施工阶段安全风险管理特点,通过对建筑工程施工阶段安全风险因素的分析,建立了基于作业条件风险评价法和模糊综合评价法的建筑工程施工安全风险评价指标体系,构建了LEC-FCE的评价模型。并选择了南京市六合区“紫晶广场”工程项目为实证研究对象进行实证分析。通过查阅资料、实地调研和专家咨询等获得相关项目数据。根据项目具体情况,运用LEC方法计算得出各级指标的具体权重,再利用FCE方法对建筑工程施工阶段安全风险现状进行评价,得出该项目安全管理应该注意的风险因素和安全等级,评价结果符合实际情况。最后结合理论研究和实证研究的分析,探讨了相关的建筑工程项目施工安全风险管理的应对策略,以期对建筑工程安全风险管理水平提高有所帮助,减少建筑工程施工中安全事故的发生。 关键词:建筑施工;安全风险;评价指标;LEC;模糊综合评价

建筑工程承包合同风险的防范措施示范文本

建筑工程承包合同风险的防范措施示范文本 In The Actual Work Production Management, In Order To Ensure The Smooth Progress Of The Process, And Consider The Relationship Between Each Link, The Specific Requirements Of Each Link To Achieve Risk Control And Planning 某某管理中心 XX年XX月

建筑工程承包合同风险的防范措施示范 文本 使用指引:此解决方案资料应用在实际工作生产管理中为了保障过程顺利推进,同时考虑各个环节之间的关系,每个环节实现的具体要求而进行的风险控制与规划,并将危害降低到最小,文档经过下载可进行自定义修改,请根据实际需求进行调整与使用。 建筑工程合同风险较大,化解风险是建筑企业非常关 注的问题。建筑企业要正确评价风险,采取适当的防范措 施。 风险的来源 建筑工程合同风险属于建筑工程风险,建筑工程周期 较长,所涉及的风险因素多,风险较大。虽然参与工程的 各方均有风险,但承担风险的大小却有所不同。具体来 讲,在一个工程中,在建设工程决策阶段,业主承担主要 风险,投资决策失误意味着整个项目的失败。在工程建造

过程中,建筑企业承担的风险远大于业主。正是这个原因,建筑行业中增大了建筑企业的索赔权限。建筑工程合同的风险主要有以下几点:一是投资风险;二是非建筑企业原因造成的社会风险和客观风险,如地震等自然灾害,这种风险一般难于预料和防范;三是主观类风险,这里特指不讲诚信的欺诈类风险。 风险的识别 应该看到,任何建筑企业在承揽工程时不可能不承担风险,但如何承担风险,承担多大风险,以及如何化解风险是一个建筑企业不得不关注的问题。化解风险之前必须对其进行识别,风险管理实际上就是一个识别、确定风险和化解风险的过程。 建筑工程风险识别有以下特点:第一,个别性。由于

安全生产风险分析研判报告

陕西神木XXX矿业有限公司 矿井安全生产风险分析研判报告 编制人: 总工程师: 矿长: 陕西神木XXX矿业有限公司 二0一八年八月六日

目录 一、基本情况 (1) (一)矿井情况 (1) 1、企业性质及规模简介 (1) 2、矿井生产及辅助系统简介 (1) (1)通风系统 (1) (2)运输系统 (2) (3)供电系统 (2) (4)供水系统 (3) (5)排水系统 (3) (6)瓦斯防治系统 (3) (7)防灭火系统 (4) (8)防尘系统 (4) 3、生产建设现状 (4) 4、安全生产标准化达标情况 (5) 5、矿井主要灾害分类分级 (5) 6、“六大系统”简介 (5) (1)监测监控系统 (6) (2)人员定位系统 (6) (3)通讯系统 (6) (4)压风自救系统 (6) (5)供水施救系统 (6)

(6)紧急避险系统 (7) (二)组织开展安全分险研判分析情况 (7) 二、主要安全风险分析 (7) (一)矿井灾害安全风险分析 (7) 1、瓦斯风险分析 (7) 2、通风风险分析 (8) 3、防灭火风险分析 (10) 4、煤尘风险分析 (11) 5、监测监控风险分析 (11) 6、煤与瓦斯突出风险分析 (12) 7、爆破风险分析 (12) 8、水害风险分析 (12) 9、顶板风险分析 (13) 10、机电风险分析 (15) 11、运输风险分析 (16) (二)8个方面突出问题分析 (17) 1、采掘接续失调组织生产风险分析 (17) 2、主要生产安全系统不完善、不可靠风险分析 (17) 3、安全监控系统运行不正常风险分析 (17) 4、重大灾害治理不到位风险分析 (17) 5、安全生产主体责任不落实风险分析 (17) 6、蓄意违法违规生产建设风险分析 (18)

安全生产风险分析报告

安全生产状况分析报告 根据XXX对在建项目安全日常检查和专项检查情况,现将在建公路水运项目安全生产状况分析如下: 一、全县在建重点公路水运项目生产安全总体情况(一)生产安全事故总体情况 xx年,全县在建公路水运项目共9个,其中,县道项目1个,乡道项目3个,渡口改桥梁项目4个,新建桥梁1个。 全年,全县在建公路水运项目未发生生产安全事故(零事故)。(二)检查发现隐患总体情况 xx年局质监办根据安全日常检查和专项检查情况,共检查14次,涉及9个项目,检查共发现安全隐患22处。按照隐患类别统计,安全基础管理类隐患10处,占48%,施工现场安全管理类隐患12处,占52%。 二、安全隐患统计分析 (一)按隐患类型分析 1.安全基础管理方面。安全生产费用管理、安全生产管理制度、安全生产条件、安管人员持证、安全体系建立、风险评估、应急管理、隐患排查记录等是安全基础管理方面数量最多、存在项目最广的安全隐患。这类隐患共10处,主要集中在新开工项目安全生产条件的检查工作开展不到位、记录不全等方面。

表1 xx年安全基础管理方面不同隐患类型统计分析表 2.施工现场安全管理方面。安全防护类、警示标志类、高处作业类是施工现场安全管理方面数量最多、涉及项目最广的安全隐患。这类隐患共11处,分别在近半数的项目上都有所体现。这反映出大部分项目在临边防护,警示提醒、高空作业安全防护及人员上下通道等方面安全管理不到位。 表2 xx年施工现场安全管理方面不同隐患类型统计分析表 三、突出安全隐患分析 (一)安全基础管理方面 1.安全生产费用使用管理不到位。主要表现为: (1)施工单位未按要求编制本项目的安全生产费用计划,未按要求建立安全生产费用使用台账; (2)现场的安全防护用具偏少,安全生产经费投入不足。 2.安全生产管理制度执行不到位。主要表现为: 安全保证体系责任未落实到人,安全检查记录、台账不完善;汛期安全生产工作开展不到位,汛期安全专项方案粗糙,汛期隐患排查资料不全等。

项目施工安全风险评估报告

项目施工安全风险评估报 告 Prepared on 22 November 2020

余杭区鸬鸟镇2018年“四好农村路”提升改造工程 施 工 安 全 风 险 评 估 报 告 编制人: 技术负责人: 项目经理: 浙江沪杭甬养护工程有限公司 余杭区鸬鸟镇2018年“四好农村路”提升改造工程项目经理部 二0一八年九月 目录 一、编制依据 ............................................... 错误!未定义书签。 二、风险评估 ............................................... 错误!未定义书签。 1、评估对象目标及范围..................................... 错误!未定义书签。 评估对象............................................... 错误!未定义书签。 2、评估目的............................................... 错误!未定义书签。 二、工程概况及主要工程数量 ................................. 错误!未定义书签。工程概况.................................................. 错误!未定义书签。主要工程数量.............................................. 错误!未定义书签。

三、评估过程和评估办法 ..................................... 错误!未定义书签。 成立风险评估小组......................................... 错误!未定义书签。 评估办法................................................. 错误!未定义书签。 四、公路工程风险评估 ....................................... 错误!未定义书签。 总体风险评估.............................................. 错误!未定义书签。 专项风险评估.............................................. 错误!未定义书签。 风险分析................................................. 错误!未定义书签。 安健环危害因素分析........................................ 错误!未定义书签。 五、活动风险源辨识 ......................................... 错误!未定义书签。 活动风险等级划分......................................... 错误!未定义书签。 风险等级判断.............................................. 错误!未定义书签。 七、风险控制 ............................................... 错误!未定义书签。 八、评估结论 ............................................... 错误!未定义书签。 施工安全风险评估报告 一、编制依据 1、余杭区鸬鸟镇2018年“四好农村路”提升改造工程招标文件。 2、余杭区鸬鸟镇2018年“四好农村路”提升改造工程施工设计图。 3、国家有关部门颁布的有关现行技术规范。 4、从现场踏勘调查、咨询获得的有关资料。 二、风险评估 1、评估对象目标及范围 评估对象 评估的对象是余杭区鸬鸟镇2018年“四好农村路”提升改造工程。 评估范围 评估范围为余杭区鸬鸟镇2018年“四好农村路”提升改造工程施工阶段的风险评估,包括对安全、工期、环境以及第三方风险进行评估。风险评估与